Construction of a warehouse hall with an area of 1,000 m2 with an office part and land development

The hall has a steel structure, insulated – covered with polyurethane sandwich panels. Office and social part, two-story with a building area of 400 m2.

All works carried out by Stalkoncept Sp. z o. o. as the General Contractor, comprehensively including turnkey finishing works.

The construction works included the following stages:

  1. HALL: – Preparatory and earthworks – Foundations – Insulation – Underlays – Reinforced concrete structure – Masonry structures – Steel structure of the roof and columns – Floors – Wall cladding made of sandwich panels – Roof with gutters
  2. OFFICE BUILDING – Preparatory and ground works – Foundations – Insulation and backfilling of foundations – Underlays – Masonry structures – Reinforced concrete structure – Installation of joinery – Floors – Plasters – Roof – Facade + parapet 3. AREA DEVELOPMENT – Retaining wall and stairs – Surfaces paving stones – Greenery – Linear drainage + street inlets –

    Zbornik Amer Skład Lublin, 2018

Lublin, 2018