Recently completed
Construction of a service building (warehouse with a social part) (Opacz Mała, Mazowieckie)
August 2024 – December 2024 (in progress)
Scope: execution of the executive design, earthworks, foundation works, substructure for the floor, masonry and reinforced concrete works of the social building, prefabrication and assembly of the steel structure of the hall, cladding of walls and roof with sandwich panels, assembly of light bands, construction of the sloping roof of the building, assembly of joinery, execution of industrial flooring
Construction of the Yabimo Sp. z o. o. hall, ICELAND
June 2024 – September 2024 (in progress)
Subcontracting works on the construction of a hall with dimensions approx. 15.5 x 58 m (installation of steel structure approx. 70 tons, installation of wall panels approx. 1450 m2, installation of balustrades, construction of roof in the trapezoidal sheet system, thermal insulation, PVC membrane approx. 900 m2, installation of guttering, installation of floor on the mezzanine, installation of windows, doors and gates)
Construction of a service building with office and residential parts (Racławówka, Boguchwała commune)
May 2024 – September 2024 (in progress)
Building with dimensions 14.4 x 16.8 m, steel supporting structure with a separate office and residential part in mixed technology (brickwork with reinforced concrete elements), wall and roof cladding made of sandwich panels.
Construction of a warehouse and office building (Tajęcina, Jasionka commune)
May 2024 – September 2024
A steel-structure warehouse hall clad with sandwich panels with an area of approx. 1,480 m2, a two-story office building with a flat roof with a building area of approx. 130 m2.
Construction of a service building in Courtelary (Switzerland)
February 2024 – June 2024
Scope: preparation of the executive design of the above-ground structure, prefabrication and assembly of the steel structure, installation of trapezoidal sheet metal on the ceiling, delivery of steel for ceiling reinforcement, wall cladding with sandwich panels, construction of the roof in the trapezoidal sheet metal system, thermal insulation, PVC membrane, delivery and assembly of joinery and external roller shutters, installation of PV installations
Flyover – Norway
January 2024 – May 2024
Subcontracting works on the construction of a flyover approx. 300 m long (installation of sandwich panels approx. 3750 m2, installation of PVC membrane approx. 850 m2, installation of guttering, installation of sheet metal flashings).
Construction of an office, warehouse and service building with hardening of the area and installations (Dąbrowa, Świlcza commune)
August 2023 – June 2024
Construction of an office, warehouse and service building with hardening of the area and installations (Dąbrowa, Świlcza commune).
Hall with an area of approx. 1000 m2, steel structure, walls made of sandwich panels, roof in the system: trapezoidal sheet metal, thermal insulation, PVC membrane
FARMER, Wietlin Trzeci
06.2023 – 09.2023
Construction works involving the construction of foundations for silos for the Cooperative of Grain and Rapeseed Producers “Farmer”.
Spółdzielnia Rolników SAN
04.2023 – 09.2023
Construction of a 450 m2 hall with social and office facilities (200 m2), expansion of the laboratory, partial demolition of the existing building and partial demolition of the hardening of the area.
Family park in Obsza
03.2023 – 05.2023
General contracting. Construction and equipment of the Family Park in Obsza – creation of a play subzone – construction of a recreation hall for tourism purposes. Building area: 680 m2. A single-story steel structure building covered with sandwich panels. The building has a rectangular plan with dimensions. 15.04×45.40 m, topped with a gable roof. Half of the front of the building with the main entrance is glazed and covered with a suspended glass roof.
PHZ HEJS, Rudnik
06.2022 – 04.2023
Construction works regarding the construction of a production hall in Rudnik nad Sanem. Usable area 843.80 m2 – steel structure – height 7.5 m at the highest point – gable roof (slope 8%), – loading yard area to be hardened – approx. 1,350 m2, concrete hardening. Delivery and installation of layered roof panels along with the delivery and installation of rooflights 670 m2.
Plant Research Center, Skołoszów
12.2022 – 03.2023
Construction of a steel hall for storing grain and equipment along with farm infrastructure at the Central Center for Research and Varieties of Cultivated Plants in Skołoszów.
WODA LEŻAJSK, Leżajsk
11.2021 – 12.2022
Construction of production, storage and research and development facilities for Woda Leżajsk Sp. z o. o. along with finishing elements and land development.
JPS PERFORMANCE, Switzerland
07.2022 – 12.2022
Granges Hall – delivery and assembly of a steel structure with equipment elements, assembly of aluminum joinery and joinery, delivery of reinforcing steel, delivery and assembly of mezzanines with finishing, delivery and assembly of ventilation flaps, delivery and assembly of a photovoltaic installation.
KISAN, Kańczuga
07.2021 – 12.2021
Construction works consisting of the construction of a warehouse building with preparatory works.
DANZ, Lubartów
04.2021 – 05.2021
Delivery and assembly of a steel structure with cladding of the walls and roof of the hall made of sandwich panels, construction of light strips, roof covering of the shelter made of trapezoidal sheet metal, and delivery and assembly of external joinery and joinery.
MONAWI, Krzemienica
11.2020 – 09.2021
Construction of an office, service and production building “Centrum Badawczo Rozwojowe” with water and sewage connections and the construction of 24 parking spaces, along with obtaining an occupancy permit.
WIKLINOWY OGRÓD, Niechobrz
03.2020 – 05.2021
Construction works consisting of the construction of a production hall with part in developer’s condition and the performance of partial works on a warehouse shelter as well as land development and installations.