Construction of a service building in Courtelary (Switzerland)

Ordering party:
JPS PERFORMANCE, Szwajcaria

The building has a building area of ​​approx. 700 m2, two-storey

Scope of implementation: preparation of the executive design of the above-ground structure, prefabrication and assembly of the steel structure, assembly of trapezoidal sheet metal on the ceiling, supply of steel for ceiling reinforcement, cladding of walls with sandwich panels, construction of the roof in the trapezoidal sheet metal system, thermal insulation, PVC membrane, supply and assembly of joinery and external roller shutters, assembly of PV installation

Order party: JPS PERFORMANCE, Switzerland

Szwajcaria, luty 2024r. – czerwiec 2024r